360° Site Walk – Post Tensioned Slab

  • Suitable for: Builders, Site Managers/Engineers, Project Managers/Engineers, etc.
  • Chosen by: Tier 1-2 builders including Hansen Yuncken.
  • Length: Total 1.5 hours
  • Access: 6 months access on mobile & PC

Learning Outcomes site walk building:

  • Coordinate structural works for a suspended PT slab in pre pour stage
  • Plan concrete works for a suspended PT slab during the pour
  • List the structural related works for a suspended PT slab after the concrete pour

You Will Learn:

  • What are the major components of a formwork system and what are the critical checks?
  • What are the major components of a post tensioning system used in a suspended slab?
  • What are the key check list items when inspecting the Reo and PT for a suspended slab?
  • What are the key items to be checked during the concrete pour of a suspended slab?
  • What are the major structural works for a suspended slab after the concrete pour?

About Instructor

+1 enrolled
Not Enrolled
This course is currently closedNotify Me!

Course Includes

  • 13 Lessons
  • 10 Topics
  • 1.5 Course Point

Ratings and Reviews

0.0
Avg. Rating
0 Ratings
5
0
4
0
3
0
2
0
1
0
What's your experience? We'd love to know!
No Reviews Found!
Show more reviews
What's your experience? We'd love to know!