Embedded Shoring Walls – Ground Works Series (1)

  • Suitable for: Builders, Site Managers/Engineers, Project Managers/Engineers, etc.
  • Length: Total 1.5 hours
  • Access: 6 months access on mobile & PC
Course
Materials

Learning Outcomes:

  • Coordinate the design requirements for embedded shoring walls
  • Supervise different construction stages of embedded shoring wall on site
  • Ensure quality in high risk items in all stages of work from design to construction

You Will Learn:

  • What is embedded shoring wall and why is required?
  • What is the correct construction sequences of embedded shoring walls?
  • What is dewatering and why is required?
  • What are ground anchors and their on-site risks?
  • What are the other shoring wall support methods?
  • What are the selection criteria for various embedded shoring wall types?
  • What is the construction procedure and on-site issues with the following shoring walls:
    –  Sheet Pile Wall
    –  Soldier Pile Wall
    –  Secant Pile Wall
    –  Contiguous Pile Wall
    –  CSM Wall
    –  Diaphragm Wall
  • What does “Zone of Influence” behind the retaining wall mean and what can go wrong?

The module you are trying to access does not exist.

About Instructor

Joel Huang

4 Courses

Not Enrolled
This course is currently closedUpcoming - Notify Me!

Course Includes

  • 10 Lessons
  • Course Certificate
  • 1.5 CPD Points

Ratings and Reviews

0.0
Avg. Rating
0 Ratings
5
0
4
0
3
0
2
0
1
0
What's your experience? We'd love to know!
No Reviews Found!
Show more reviews
What's your experience? We'd love to know!

Responses

Your email address will not be published. Required fields are marked *