Non-Embedded Shoring Walls – Ground Works Series (2)

  • Suitable for: Builders, Site Managers/Engineers, Project Managers/Engineers, etc.
  • Length: Total 1 hour
  • Access: 6 months access on mobile & PC

Learning Outcomes:

  • Coordinate the design requirements for non-embedded shoring walls
  • Supervise different construction stages of non-embedded shoring wall on site
  • Ensure quality in high risk items in all stages of work from design to construction

You Will Learn:

  • What is pour staging/planning and what to know?
  • What is non-embedded shoring wall?
  • What is the correct construction sequences of non-embedded shoring walls?
  • What is wall drainage and why is required?
  • What are the common failure mechanism of non-embedded walls
  • What are the selection criteria for various non-embedded shoring wall types?
  • What is the construction procedure and on-site issues with the following shoring walls:
    –  Gravity Wall
    –  Soil Nail Wall
    –  Reinforced Soil Wall
    –  Cantilevered Wall
    –  Structural Wall
    –  Dincel Wall
  • What does “Zone of Influence” behind the retaining wall mean and what can go wrong?

About Instructor

Joel Huang

4 Courses

Not Enrolled
This course is currently closedUpcoming - Notify Me!

Course Includes

  • 10 Lessons
  • Course Certificate
  • 1 CPD Points

Ratings and Reviews

0.0
Avg. Rating
0 Ratings
5
0
4
0
3
0
2
0
1
0
What's your experience? We'd love to know!
No Reviews Found!
Show more reviews
What's your experience? We'd love to know!